The Siding Installation Process: What’s the Timeline?

The siding installation process and timeline can vary depending on factors such as the square footage of the project, the type of siding material used, and weather conditions. Ask your siding contractor for a timeline based on your specific job. However, here’s a general outline.

New Jersey Siding Installation Process and Timeline

Is it time for a siding replacement job? Here’s what to expect from the siding installation process

  • Step 1: Request a free inspection and consultation with a reputable siding contractor.
  • Step 2: The installation crew will remove the old siding to prepare for new siding installation. 
  • Step 3: Crews will install flashing and weatherproofing.
  • Step 4: Crews will install trim and accessories.
  • Step 5: The siding is installed.
  • Step 6: Ventilation and drainage are set in place.
  • Step 7: Finishing touches are completed. 
  • Step 8: The crew cleans up, and final inspections are completed.
  • Step 9: With RJW Exteriors, we’ll conduct a customer care visit and installation walk-through.
  • The siding installation’s timeline varies depending on the size of the project, the type of siding used, and the weather conditions. 

Step 1: Request a free inspection and consultation with a reputable siding contractor.

If you suspect it might be time for a siding replacement project, contact a siding contractor in your area. It’s worth noting that if you are interested in a specific product, such as vinyl siding or James Hardie fiber cement siding, narrow your search to find a preferred contractor in your area. 

Your professional contractor will thoroughly inspect the existing siding, trim, exterior walls, and underlying structure. They will measure and assess the area to be covered, taking note of any repairs or replacements needed before giving you a detailed estimate and timeline for the siding project. 

Step 2: The installation crew will remove the old siding to prepare for new siding installation. 

 When the installation crew arrives, the first task will be to remove the old siding, trim, and accessories, ensuring that any damaged or rotted sections are replaced or repaired. Before proceeding with the installation, they may need to address any structural issues, moisture damage, or insect infestations.

Step 3: Crews will install flashing and weatherproofing.

Next, the crews will install flashing, house wrap, and weather-resistant barriers to protect your home against weather and debris.

Siding contractor installs replacement siding

Step 4: Crews will install trim and accessories.

Your crew will install trim pieces, corner posts, soffits, fascia, and other accessories as per the design plan and manufacturer’s guidelines. They will continue the process by properly sealing and caulking joints, corners, and openings to prevent water infiltration and improve energy efficiency.

Step 5: The siding is installed.

The crews will cut siding panels to size, ensuring proper overlaps and alignment. Please note that a reputable New Jersey contractor will install siding materials according to manufacturer specifications, using appropriate fasteners and techniques for secure attachment.

Step 6: Ventilation and drainage are set in place.

Once the replacement siding is in place, the crews will ensure proper ventilation and drainage to prevent moisture buildup behind the siding, reducing the possibility of wood rot.

Step 7: Finishing touches are completed. 

The crew will apply caulking, sealants, and paint or stain as needed to enhance aesthetics, protect against weathering, and improve energy efficiency. At RJW Exteriors, we offer customizable color, texture, and finish options to complement your home’s style.

Step 8: The crew cleans up, and final inspections are completed.

The crew will clean up old materials and stray nails. A final inspection of your home’s exterior is completed to ensure the siding installation meets quality standards, building codes, and manufacturer recommendations.

The siding installation timeline typically ranges from 5 to 10 days, but this can vary based on project complexity, weather delays, contractor availability, and other factors. Working with experienced contractors is essential to ensure your siding installation project goes off without a hitch. 

If your current siding is sagging, cracking, blistering, buckling, fading, or rotting, it might be time for a siding job. For a reliable contractor in Northeastern New Jersey, contact RJW Exteriors. Besides completing this exterior remodeling project, we can also help with replacement windows and doors and roof replacements. 